Greenway Design Survey: Vote!

You can give input to the signage designs for the Rail Trails:

BMTS is in need of your input and opinion in the development of the Greenway Sign Plan and Design Guide. For project details, see “About the Greenway Sign Plan & Design Guide” at the bottom of this email.

We request that you go to the website at https://sites.google.com/site/bmtsgreenway/, click inside the photo above “Design Decisions”, and take just a few minutes to fill out the survey regarding the regional greenway system (RAIL TRAIL) name, sign design, and logo design.

Please complete the survey by Monday, July 16th. That will allow our consultants to provide another draft of logos for comment in advance of our working meeting with them, tentatively scheduled for July 26th.

About the Greenway Sign Plan & Design Guide

BMTS is contracting for professional services to create a Sign Plan and Design Guide for the Greater Binghamton Greenway (GBG) regional walking and biking trail system located within the Binghamton Urban Area. This task is included in the 2012-2013 BMTS Unified Planning Work Program, and will be funded by Federal Highway Administration Metropolitan Planning Program funds.

The overall objective of the project is to have this trail system recognized as a regional, contiguous system, as well as facilitate user access to and circulation throughout the GBG, by creating a uniform design & plan for wayfinding, regulatory, warning, and interpretive signing. The geographic region of the study will include the Binghamton Metropolitan Transportation Study (BMTS) Urban Area Boundary.

 

Scroll to Top